A 13-axle tractor-trailer unit hauls a tank from B.C. port facilities. (B.C. Ministry of Transportation)

B.C. fast-tracks ‘superload’ trucks to ports, Alberta border

13-axle big rigs no longer need to wait for special permit

The B.C. government and Lower Mainland municipalities have completed a fast-track permit system to allow oversize loads and trucks with up to 13 axles to carry massive equipment components to the Alberta border via Highway 16.

The “superload” route connects with Alberta’s high load corridor, a network of designated routes built to haul drill rigs, tanks and other heavy industrial loads that can’t be broken down into smaller segments. On the B.C. side, the new “project cargo corridor” permit eliminates a wait of up to 12 days that was required to assess each oversize load and route to see if it can be allowed to hit the road without damage.

“This is expected to save the trucking industry time and increase confidence for carriers and shippers in order to attract more specialized products through B.C. ports,” the transportation ministry said in a statement Monday.

The new permit system allows trucks with between eight and 13 axles, gross vehicle weight up to 125,000 kg, width up to five metres and height up to 4.88 metres to make the trip.

The new permits allow travel by oversize loads between two ports, Fraser Surrey Docks and Lynnterm East Gate in North Vancouver, and the highway system through the Fraser Valley to Alberta.

RELATED: Pipeline companies competing for skilled workers

RELATED: Longer trucks save forest companies money, fuel

RELATED: B.C. company recognized for innovation in forestry

The ministry has signed information-sharing agreements with municipalities along the corridor, North Vancouver, Vancouver, Burnaby, Surrey, Langley and Abbotsford.

The change takes effect as work gets underway on the Trans Mountain pipeline twinning project that runs from Edmonton to Burnaby.

B.C. previously approved the use of 13-axle oversize trucks to haul logs on the Highway 16 corridor in northwestern B.C. Canfor began using the nine-axle trailers, built at Freflyt in Vanderhoof, to make transport of timber from remote locations more efficient.

The large loads also helped the industry deal with a shortage of truck drivers, as well as reducing fuel use and greenhouse gas emissions.

The log trailer and a 10-axle trailer for hauling chips were developed with assistance from FPInnovations, a private not-for-profit research and development organization specializing in wood products.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Penticton, Vernon hockey legends to be inducted into BC Hockey Hall of Fame

Vernon’s Eric Brewer and a record-breaking Penticton Vees team will join the HOF July 24

Vernon parent sounds alarm over ketamine and pill parties

RCMP have been notified and are investigating

UPDATE: Highway reopened in Coldstream after semi strikes power pole

Highway 6 cleared, power still out after crash Monday morning

Vernon builds excellence at Okanagan Housing Awards

Sunterra a five-time winner while Weninger Construction and Design wins Home of the Year

$11K fine for Vernon mutual fund dealer

Fines for altering, pre-signing documents between 2014-17

VIDEO: Canada’s first presumptive case of coronavirus officially confirmed

Both patient and wife arrived on a China Southern Airlines flight after having been to Wuhan

VIDEO: Music stars pay tribute to Kobe Bryant at Grammys award show

Music artists including Billy Ray Cyrus, Rick Ross and Kirk Franklin paid tribute to Bryant

South Okanagan ski hill reports ex-employee to RCMP, closes lift amid investigation

‘We are actively investigating and dealing with the actions of a former employee,’ said the resort

John Lennon’s psychedelic Rolls-Royce on display at Royal BC Museum

The classic car has been a favourite for Beatles fans from Victoria and internationally

Coastal GasLink stresses pipeline ‘on a schedule’ as B.C. appoints liaison for Wet’suwet’en

670-kilometre pipeline is schedule to be completed by end of 2023

Penticton woman wins $500,000 lotto prize

Anna Fodor collected $500,000 with her winning ticket

Furstenau flays NDP as she launches B.C. Green Party leadership bid

LNG, Site C dam wrong for environment, Cowichan MLA says

Fire burns through unit at Penticton motel

Quick response from the Penticton Fire Department caught the blaze before it could spread

Woman guilty of dangerous driving crash that left Saanich girl, then 11, unresponsive

Nikirk guilty of one count of dangerous driving causing bodily harm

Most Read