The Site C dam on the Peace River is one of the projects exempted from B.C. Utilities Commission review by the B.C. government.

B.C. to restore utilities commission authority

NDP says it's no coincidence that BC Hydro rates are to be kept under political control until after the 2017 election

The B.C. government has promised to restore the B.C. Utilities Commission’s independent role in setting electricity rates and add more full-time commissioners to help them do it.

Energy Minister Bill Bennett released an independent review of the commission Wednesday, and said the government intends to implement all 35 recommendations. Authority over setting BC Hydro rates for commercial and residential customers won’t be restored until 2017, after Bennett and Premier Christy Clark stepped in to cap rate increases in 2013.

The review comes after the government exempted big-ticket projects from BCUC review, including the Site C dam on the Peace River, the wireless electricity meter system and a new transmission line to northwest B.C. that ran $300 million over the original budget.

Bennett announced the government directive on BC Hydro rates after the 2013 election, with a 10-year plan that increases rates 28 per cent over five years. He acknowledged at the time that rate increases were being kept low using a “rate smoothing” account that defers more than $1 billion of the utility’s debt.

BC Hydro rates are to increase six per cent this year under the province’s directive, and then be capped at four per cent for two years after that..

“After the first five years of the 10-year plan they [BCUC] will be back in charge of setting rates,” Bennett said Thursday.

NDP energy critic Adrian Dix said the B.C. Liberal government has been overruling and sidelining the BCUC since 2003 when it directed BC Hydro to buy power from private producers. He said its political intervention on rising BC Hydro rates is designed to continue holding down rate increases until after the 2017 election.

Dix said it’s also no coincidence that Bennett received the independent review in November and held onto it until after the government had announced its decision to proceed with construction of the Site C dam.

The review panel and the regulated utilities agreed that the government has authority to set provincial energy policy and direct the BCUC on specific issues. But the report adds that the government should define those policies well in advance and “then leave the commission to act independently within its mandate.”

 

Just Posted

Hot Armstrong grads dress for success

Pleasant Valley Secondary Class of 2019 gathers for official photos at scorching Memorial Park

Armstrong school fundraising for new playground

Len Wood Middle School seeking support

Vernon police service dog aids in arrest of break-and-enter suspect

Heavy police presence results in PSD Jagger finding suspect

Free flights for kids return courtesy Vernon Flying Club

The COPA For Kids event July 13 at Vernon Airport introduces children and teens to aviation

Vernon senior feels trapped in long-term care facility

Rose-Marie Lepodvin says she wants assisted living, but feels trapped in long-term care

VIDEO: ‘Avengers: Endgame’ to be re-released with new footage

‘Avatar’ holds global box office record at $2.788 billion, while ‘Endgame’ stands at $2.743 billion…

B.C. teen killed by falling tree near Victoria

Second youth also injured in freak incident during field trip at Camp Barnard near Sooke

South Okanagan mountain resort sees lengthy snowfall

Snow stayed on the ground for four, says resort manager

Elias Pettersson wins Calder Trophy as NHL’s top rookie

Vancouver forward first Canuck to win award since Pavel Bure in 1992

FVRD chair calls B.C. incineration plan for Philippines waste ‘disturbing’

Metro Vancouver ‘uniquely capable’ of safely disposing of waste coming back to Canada, say officials

VIDEO: Acknowledging skeptics, finance minister vows to build Trans Mountain project

Bill Morneau said he recognizes ‘huge amount of anxiety’ in Calgary over future of oil and gas sector

Shovels could be in the ground on Trans Mountain by September, CEO says

Ian Anderson points to weeks likely required for NEB to reinstate 2016 regulatory record

Interior forestry workers ratify five-year contract

It was approved by United Steelworkers Local 1-417, which represents workers in Kamloops, Kelowna

Scorpion gives birth after hitching ride in B.C. woman’s luggage

A Vancouver woman inadvertently brought the animal home from a trip to Cuba

Most Read