Construction of LNG Canada plant still on hold

Construction will only begin following a positive final investment decision

LNG Canada says media reports published on Tuesday about a definite go-ahead for construction of an LNG plant in Kitimat are misleading.

The reports centred around comments attributed to LNG Canada CEO Andy Calitz that were made at an investor conference in Vancouver on Tuesday.

“Since the Final Investment Decision delay in 2016, LNG Canada has been preparing for a future FID targeted for the second half of 2018, which would enable the beginning of construction in late 2018,” said LNG Canada external relations director Susannah Pierce.

She said the final investment decision is up to LNG Canada’s Joint Venture Participants to make, and that the exact date for that decision is also theirs.

“Mr. Calitz’s comments should not be interpreted as an announcement of FID, but his continued aspiration that FID occurs in 2018,” added Pierce.

This isn’t the first time that Calitz’s comments have been misconstrued as confirmation that construction is a go.

In March media reports referred to comments made by Calitz at a conference in Vancouver as proof of a positive FID.

Pierce reiterated at the time that Calitz’s was merely confirming that LNG Canada was working towards having materials ready in mid-2018 to provide to the project’s Joint Venture Participants for an FID.

“If that decision is a positive one, construction would begin right after. The final investment decision, however, and the date that it will be made, will be up to LNG Canada’s joint venture participants to make,” said Pierce at the time.

LNG Canada has stressed before that residents of Kitimat and Kitamaat Village, and the Northern Sentinel, are at the top of a list of interested parties that will be informed once a final investment decision has been made.

Just Posted

Wildfire sparks near perimeter of devastating 2017 Elephant Hill fire

Ground crews and aircraft are responding to an estimated 50 hectare wildfire approximately 55 kilometers northwest of Kamloops, near the Deadman Vidette Road.

Okanagan Regional Library names new CEO

Don Nettleton, who has been with ORL for 24 years, takes over from Stephanie Hall

Vernon tax notices issued

Residents have until July 3 to pay and/or collect home owner grant if eligible

UPDATE: Power restored for nearly 3,000

Accident cuts off power to Vernon and Coldstream homes for several hours Wednesday evening

SilverStar reaches new heights with gondola

Vernon ski resort installing new feature, with opening date set for July 7

MLA pushing province and pharmaceutical to save Vernon woman

Cystic fibrosis patient can’t afford $20,000/month medication she needs to survive

Two-year-old found unresponsive in pool

Mission RCMP located toddler after she went missing from a local daycare

Surrey RCMP issue warning after third sexual assault this week

It is the third sexual assault since Sunday

Toronto opening 800 emergency spaces to deal with influx of refugee claimants

Beginning Thursday, Toronto will temporarily house refugee claimants and new arrivals in 400 beds in the city’s east end.

Breaking: Trump cancels summit with North Korea

Trump cancels June 12 summit with North Korea’s Kim, citing ‘tremendous anger and open hostility’ in recent statement

Rivers rising: Floods in B.C., New Brunswick a warning of what’s to come

In B.C., thousands of residents are returning to homes this week marked with red or yellow signs indicating a health inspection is necessary

North Korea demolishes nuke test site with series of blasts

North Korea has carried out what it says is the demolition of its nuclear test site in the presence of foreign journalists.

Penticton homeless campers devastated by park cleanup

Two women, in their 50s and 60s, said they felt like giving up after their only home was cleared out

Study recommends jurors receive more financial and psychological support

Federal justice committee calls for 11 policy changes to mitigate juror stress

Most Read