Skip to content

Funding received for Summerland dam spillway project

Grant for close to $2M announced for Isintok Dam work
33496780_web1_230810-SUM-Isintok-Dam-funding-SUMMERLAND_1
The municipality of Summerland has received close to $2 million in grant funding for work at the Isintok Dam. (District of Summerland image)

The municipality of Summerland has been awarded a grant from the province’s Community Emergency Preparedness Fund to upgrade the Isintok Dam spillway.

The grant is for $1,939,590.

Design work has been completed by Kerr Wood Leidal Engineering Consultants and construction of the project is scheduled for 2024.

READ ALSO: Summerland reservoir upgrade completed under budget

READ ALSO: Summerland receives grant for Isintok Lake spillway upgrade

The work will include replacing the existing concrete spillway structure, excavating the spillway channel to make it wider, replacing the culvert through the access road with a single-span bridge, installing riprap in the modified section of the spillway channel and at bridge abutments and installing a remote monitoring system for reservoir level, dam outflows, precipitation, wind and temperature.

“The Isintok spillway is at the end of its serviceable life and moving forward with this project will help improve the safety and security of our water supply,” said Mayor Doug Holmes. “We appreciate the provincial government for their investment in this critical area.”

Engineering reviews from 2020 to 2022 confirmed the Isintok spillway is undersized, has become deteriorated and poses a flood risk to Summerland.

The provincial dam safety office ranks Isintok Dam as a “very high consequence” dam, meaning it has the potential to cause significant impact to human life, the environment, and properties in an extreme inflow event. With continued downstream development, there is potential for it to be considered an “extreme consequence” dam.

In recent years, the municipality has done other work at the dam, including work on the dam outlet which was completed in 2022. In February 2023, the municipality received funding for the design of the Isintok Dam Spillway Upgrade project.

A dam has been in place at the reservoir lake west of Summerland since 1926.

To report a typo, email:
news@summerlandreview.com
.



news@summerlandreview.com

Like us on Facebook and follow us on Twitter and subscribe to our daily and subscribe to our daily newsletter.

Be Among The First To Know

Sign up for a free account today, and receive top headlines in your inbox Monday to Saturday.

Sign Up with google Sign Up with facebook

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Reset your password

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

A link has been emailed to you - check your inbox.



Don't have an account? Click here to sign up


John Arendt

About the Author: John Arendt

John Arendt has worked as a journalist for more than 30 years. He has a Bachelor of Applied Arts in Journalism degree from Ryerson Polytechnical Institute.
Read more