MLA irked by budget hike for Highway 1 expansion in Shuswap

MLA irked by budget hike for Highway 1 expansion in Shuswap

Former Transportation Minister Todd Stone critical of $61.1 million increase

  • May. 11, 2020 10:00 a.m.

By Michael Potestio/Kamloops This Week

The former minister of transportation isn’t pleased with a number of shortcomings in upcoming roadwork expanding Highway 1 through the Shuswap area, east of Kamloops.

The provincial NDP government has issued a tender for phase one of the expansion project — a 3.3-kilometre stretch of the Trans-Canada Highway from Chase Creek Road to Chase West.

Work is scheduled to begin later this summer and will involve four-laning the highway, installing protected T-intersections at Chase Creek Road and Shuswap Avenue, adding a pedestrian crossing and multi-use pathway to link the Neskonlith Indian Band and the Village of Chase and building a cattle underpass and new frontage road.

The project, however, comes with a $61.1 million budget increase — to $260.3 million.

Kamloops-South Thompson Liberal MLA Todd Stone, who oversaw project planning as transportation minister before the NDP gained power in 2017, said the current government is providing less for more money.

Stone noted the project contains fewer kilometres of road expansion, a more restrictive type of interchange, is behind schedule and lacks a timeline for the proposed third phase.

Phase one was supposed to include full-access interchanges rather than protected T-intersections, which Stone said provide limited access.

“If you’re heading from Kamloops to Chase, a protected T (intersection) access enables you to go into the Village of Chase, but you can’t come out of the Village of Chase at that same location,” he said, noting an interchange allows for an overpass.

Stone estimated the government is saving about $25 million per interchange by making the change.

He also noted this phase was ready to begin in the summer of 2017.

In a release, the NDP government said original estimates for the Chase four-laning project, completed in 2015, were done “with limited engagement and engineering and reflect a very early level of understanding about the project.”

Read more: Tender for construction of Salmon River Bridge to be issued in coming months

Read more: Trans-Canada Highway to be expanded to four lanes in Chase

Read more: Illegal dumping increasing along North Okanagan-Shuswap roads

“Since then, significant detailed engineering investigations, along with consultation with the Pespesellkwe of the Secwépemc Nation and the Village of Chase, have been completed,” the government press release stated, adding that work, combined with increasing labour costs and a hot construction market, resulted in the budget increase.

Stone said that claim is “simply not true,” arguing enough engineering investigations were done and the project was tender-ready in 2017.

“The design was done, the engineering work was done,” he said.

The other two phases include roadwork from Hoffman’s Bluff to Chase Creek Road, west of phase one, and Chase West to the Chase Creek Bridge to the east.

Stone said that eastern section was originally set to extend to Jade Mountain — a 3.4-kilometre section that is now just 1.6 kilometres in length.

According to the province, that phase will involve highway widening and an interchange at Brooke Drive, as well as other improvements on Brooke at Shuswap Avenue. Detailed design work and consultation is said to be ongoing, with work to start in 2021.

As for the Hoffman’s Bluff section, Stone noted it was only mentioned in the news release as no longer being in the construction schedule.

“That tells me that we’re not going to be able to expect to get that section done,” Stone said. “It’s doubtful at this point as to when it will start.”

The release stated the segment remains a priority, but as it runs through the Neskonlith reserve, the government is continuing to develop a design, determine the property required and address concerns of the band.

In 2017, Stone said, his government was “substantially in agreement with the Neskonlith” and all that remained was to secure a specific federal approval, which could have taken up to a year to receive.

“Chief Judy Wilson and I had spent a lot of time ensuring the needs of the Neskonlith Indian Band were met,” Stone said.

Stone believes the project has been altered to address cost escalation, which he blames largely on the requirement of union-only labour and three year delay. He said he intends to press the government in the weeks ahead regarding why the project cost has increased while its scope has shrunk.

Like us on Facebook and follow us on Twitter

BC Liberalstrans-canada highway

Just Posted

FILE – Perry Bellegarde, National Chief of the Assembly of First Nations, takes part in an event on Parliament Hill in Ottawa on Tuesday, July 7, 2020. THE CANADIAN PRESS/Sean Kilpatrick
Indigenous Peoples Day must be a ‘call to action’, says Assembly of First Nations chief

Discovery of children at Kamloops residential school site must lead to change, Perry Bellegarde says

This undated file photo provided by Ernie Carswell & Partners shows the home featured in the opening and closing scenes of The Brady Bunch in Los Angeles. Do you know the occupation of Mike Brady, the father in this show about a blended family? (Anthony Barcelo/Ernie Carswell & Partners via AP, File)
QUIZ: A celebration of dad on Father’s Day

How much do you know about famous fathers?

North Westside residents can dispose of their unwanted bulky items between June 30 and July 14, 2021. (File photo)
North Westside residents can soon get rid of unwanted bulky items

Large household items can be disposed of at North Westside Transfer Station June 30 to July 14

Starting in 2022, the Columbia Shuswap Regional District is extending dog control to the entire Electoral Area D area. (Stock photo)
Dog control bylaw passes in Shuswap area despite ‘threatening’ emails

CSRD board extending full dog control to Electoral Area D; director calls for respectful discussion

The new Civic Memorial Park will incorporate pieces of the 80-year-old arena it replaces. (Artists rendering)
Pieces of Civic Arena reclaimed for new Vernon park

City centre space to incorporate wood from the historic arena

Marco Mendicino, Minister of Immigration, Refugees and Citizenship during a press conference in Ottawa on Thursday, May 13, 2021. THE CANADIAN PRESS/Sean Kilpatrick
Canada to welcome 45,000 refugees this year, says immigration minister

Canada plans to increase persons admitted from 23,500 to 45,000 and expedite permanent residency applications

The Sacred Hearts church on PIB land burned Monday morning. (Theresa May Jack Facebook)
Church burns on Penticton Indian Band land

The fire started around 1:30 a.m. Monday morning

Tokyo 2020 President Seiko Hashimoto and IOC President Thomas Bach, on a screen, speak during a five=party online meeting at Harumi Island Triton Square Tower Y in Tokyo Monday, June 21, 2021. The Tokyo Olympics will allow some local fans to attend when the games open in just over a month, Tokyo organizing committee officials and the IOC said on Monday. (Rodrigo Reyes Marin/Pool Photo via AP)
Tokyo Olympics to allow Japanese fans only, with strict limits

Organizers set a limit of 50% capacity — up to a maximum of 10,000 fans

The border crossing into the United States is seen during the COVID-19 pandemic in Lacolle, Que. on February 12, 2021. THE CANADIAN PRESS/Paul Chiasson
Border quarantine to soon lift for fully vaccinated Canadians

Eligible travellers must still take multiple COVID-19 tests

The Pierre family, an Indigenous family, once lived in what is now downtown Summerland. Today, Pierre Drive is named in honour of the family. (Photo courtesy of the Summerland Museum)
Pierre family played role in Summerland’s history

Downtown Summerland was once Penticton Indian Reserve #3

A portion of the George Road wildfire burns near Lytton, B.C. in this Friday, June 18, 2021 handout photo. THE CANADIAN PRESS/HO, BC Wildfire Service *MANDATORY CREDIT*
Blaze near Lytton spread across steep terrain, says BC Wildfire Service

Fire began Wednesday and is suspected to be human-caused, but remains under investigation

Jaimee Peters photo of a Willow Midwives helping with a birth. Willow closed its doors March 31 because of a shortage of midwives. (Contributed)
South Okanagan’s only midwifery to re-open this summer

Willow Community Midwives was forced to close because of a shortage of midwives

Blair Lebsack, owner of RGE RD restaurant, poses for a portrait in the dining room, in Edmonton, Friday, June 18, 2021. Canadian restaurants are having to find ways to deal with the rising cost of food. THE CANADIAN PRESS/Jason Franson
Canadian restaurateurs grapple with rising food costs, menu prices expected to rise

Restaurants are a low margin industry, so there’s not a lot of room to work in additional costs

Most Read