A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

A concept image shows a four-lane replacement for the RW Bruhn Bridge towering over the nearby railway bridge across the Sicamous Channel. (Ministry of Transportation and Infrastructure Image)

VIDEO: New Sicamous Highway 1 bridge renderings show one less lane than promised

Mayor Terry Rysz wants to see access improvements and funding for a pedestrian bridge.

According to a recent update, the replacement for the RW Bruhn Bridge along Highway 1 won’t be the five-lane structure previously chosen by the province after much public consultation.

Following a series of engagement opportunities with Sicamous residents, including a survey, open houses and a town hall meeting, through which the public provided input on three replacement options, the Ministry of Transportation and Infrastructure announced in 2018 that the existing bridge would be replaced by a five-lane span.

Sicamous Mayor Terry Rysz was a vocal proponent for one of the other options that included a four-lane highway bridge accompanied by a smaller one at Main Street. The plan with the Main Street bridge was endorsed by the Sicamous council at the time.

Though the project is currently in the detailed design phase, recent information released by the ministry, including videos and a Winter 2021 update, shows a four-lane structure – without the second bridge at Main Street.

A ministry representative said the most recent design was selected because it will allow for the closure of the Old Spallumcheen Road intersection at the west end of the existing bridge. The closure of the intersection will improve safety for users of the highway according to the ministry.

Regarding the change from five lanes to four, the ministry said this is to reduce the impact of the project on areasidentified as culturally or archaeologically sensitive, and will also allow the existing bridge to remain in service during construction of the new span.

The ministry anticipates construction of the bridge will take three years. Tree clearing and relocation of utilities are expected to be complete this year and the project is now expected to go to tender in 2022.

Along with information on project progress and next steps, the ministry released two videos which show a 3D rendering of the bridge and the off ramp and underpass which will be used to access Old Sicamous Road and Old Spallumcheen Road. The underpass was a feature of the five-lane design which is being carried over to the new plan.

According to the ministry, the project remains on-budget: $224.5 million in funding for the project was approved in 2018, with $91 million of the total coming from the federal government.

Mayor Terry Rysz says he thinks the ministry has made up their mind about the direction the bridge project will be taking but he wants to see some features added to it. Rysz said he wants to ensure ease of access for traffic off the highway into Sicamous’ downtown commercial areas, and easy access to the west side of the Sicamous channel.

In particular, Rysz said he and the rest of the Sicamous council would be lobbying the ministry for help in building an extension of Silver Sands Road allowing another access point for drivers to get off the highway and into town.

Since the second car bridge at Main Street was removed from the plans, Sicamous’ council has been seeking help for the construction of a pedestrian suspension bridge over the channel. Rysz said the ministry referred them to an active transportation grant program, but he estimated the cost of a suspension bridge at over $5 million and was unsure how much of the grant would cover. He said a pedestrian link across the Sicamous channel is essential to the District’s plans to serve as a gateway to the Sicamous to Armstrong Rail Trail which is under construction.

Read more:Single-bridge option chosen to replace RW Bruhn Bridge

Read more: Sicamous mayor addresses Main Street bridge misinformation

Read more: Main Street bridge won’t cost district

Read more: Opinions divided on bridge options

Read more: Public favours five-lane option to replace Bruhn Bridge

While the current plan for the highway bridge shows a walkway alongside the eastbound lane of the highway, Rysz said he has concerns about the safety of the walkway and how it will tie into the rail trail. The existing bridge has a walkway which is not separated from traffic by barricades as the one in the photo is. Two vehicle collisions in recent years have forced vehicles over the walkway only to be stopped by the bridge railing itself, damaging it in both cases.

Overall, whatever design is settled on, Rysz said it is clear that the existing highway bridge must be replaced as soon as possible.



jim.elliot@saobserver.net

Like us on Facebook and follow us on Twitter

infrastructure

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Forward Elan Bar Lev Wise of the West Kelowna Warriors (right, shown playing for the Vernon Vipers in 2019) has been suspended nine games by the B.C. Hockey League for being the instigator and aggressor in an after-the-game fight with Vernon’s Kjell Kjemhus Monday, April 12, at Kal Tire Place. Kjemhus was given a two-game suspension for his role in the fight after the game was over. (Morning Star - file photo)
West Kelowna Warriors forward handed lengthy suspension

Elan Bar Lev Wise fought Vernon Vipers forward Kjell Kjemhus after BCHL game was over Monday, April 12; Kjemhus suspended two games

Vernon residents were able to bring propane fire pits down to Polson Park, between Jan. 25 - April 5 to enjoy with their family bubble, similar to those provided for residents at Predator Ridge. (Jennifer Smith - Morning Star)
Fire pits a flop in Vernon’s Polson Park

City spends estimated $2K on temporary program, few, if any take advantage; option closed now

Sheila Derbyshire dressed up as a scary clown to surprise her daughter, Talyn, at Len Wood Middle School in Armstrong April 12, 2021, for her 13th birthday. (Sheila Derbyshire - Contributed)
Armstrong mom sends in the clowns

‘Halloween freak’ celebrates daughter’s 13th birthday in style

Taxes are going up slightly for homeowners in 2021 to give businesses a break. (Jennifer Smith - Morning Star)
Tax shifts burden from Vernon businesses to homeowners

New rate for residential 2.67 per cent or $42 for average home

City of Armstrong community services manager and chief bylaw officer Warren Smith stands with the new food waste bin and garbage cart to be delivered to eligible residents later this month. (Brooke Hovey photo)
Armstrong changes waste collection system

Residents to be given new bins as part of the new system which goes into effect May 1

Burnaby MLA Raj Chouhan presides as Speaker of the B.C. legislature, which opened it spring session April 12 with a speech from the throne. THE CANADIAN PRESS
B.C. NDP promises more health care spending, business support in 2021 budget

John Horgan government to ‘carefully return to balanced budgets’

A shop up on Grand Oro Road near Twin Lakes burned down on Monday. (Facebook)
Fire rips through shop in small South Okanagan town

The building was destroyed despite community efforts to fight the fire

The Save Sickle Point Committee, a grassroots community group, has teamed up Penticton’s Tempest Theatre and Film Society to release short film on Sickle Point. (Contributed)
WATCH: Conservation group releases short doc on saving South Okanagan’s ‘precious’ Sickle Point

Sickle Point, the last intact wetland near Skaha Lake, is facing the prospect of development

Protesters occupied a road leading to Fairy Creek Watershed near Port Renfrew. (Submitted photo)
B.C. First Nation says logging activist interference not welcome at Fairy Creek

Vancouver Island’s Pacheedaht concerned about increasing polarization over forestry activities

Skaha Lake Middle School. (File photo)
COVID exposure at Penticton middle school

Skaha Middle School is the latest in growing lists of exposure in the Okanagan

Flow Academy is not accepting membership applications from anybody who has received a dose of the vaccine, according to a password-protected membership application form. (Submitted image)
B.C. martial arts gym refusing patrons who have been vaccinated, wear masks

Interior Health has already issued a ticket to Flow Academy for non-compliance with public health orders

A five-storey, 60-unit building has been proposed for 8709 Jubilee Rd. E., Summerland. The proposal will be the subject of a public hearing on March 22. (Image by GTA Architecture)
Zoning, OCP amendments adopted for Summerland housing development

Additional variances will be needed for controversial five-storey, 60-unit housing development

Guinevere, lovingly referred to by Jackee Sullivan and her family as Gwenny, is in need of a gynecological surgery. The family is raising money to help offset the cost of the procedure. (Jackee Sullivan/Special to Langley Advance Times)
Langley lizard’s owners raise funds for gynecological surgery

The young reptile is scheduled for operation on Tuesday

Facebook screenshot of the sea lion on Holberg Road. (Greg Clarke Facebook video)
VIDEO: Sea lion randomly spotted on remote B.C. logging road

Greg Clarke was driving home on the Holberg Road April 12, when he saw a large sea lion.

Most Read